{"id":8636,"date":"2018-05-30T07:41:57","date_gmt":"2018-05-30T05:41:57","guid":{"rendered":"http:\/\/www.electropowersystems.com\/?p=8636"},"modified":"2018-05-30T07:41:57","modified_gmt":"2018-05-30T05:41:57","slug":"tender-offer-initiated-by-engie-repayment-of-the-eib-financing-and-possible-rights-issue","status":"publish","type":"post","link":"https:\/\/devplugin.interactionfarm.com\/?p=8636","title":{"rendered":"Tender Offer initiated by ENGIE: repayment of the EIB financing and possible rights issue"},"content":{"rendered":"<p>\u2022 ENGIE\u2018s mandatory tender offer initiated by ENGIE now extended to the warrants held by the European Investment Bank (EIB).<\/p>\n<p>\u2022 EPS will proceed with the early repayment of the first \u20ac10 million tranche of the EIB financing, and the two other tranches, for a total of \u20ac20 million not drawn down, will be cancelled.<\/p>\n<p>\u2022 Repayment as well as financing and setup of necessary resources for the development of the company will occur upon completion of the tender offer and could be financed through a capital increase with preferential subscription rights (Rights Issue), to which ENGIE would participate as well, for an amount of around \u20ac30 million, for which the issuance price would be equal to the tender offer price, i.e. \u20ac9.50 per new share, subject to market conditions allowing to setup an issuance price below the share price, and which would take place before expiring of the prepayment period granted by the EIB, thus on 6 September 2018 at the latest.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>\u2022 ENGIE\u2018s mandatory tender offer initiated by ENGIE now extended to the warrants held by the European Investment Bank (EIB). \u2022 EPS will proceed with the early repayment of the first \u20ac10 million tranche of the EIB financing, and the two other tranches, for a total of \u20ac20 million not drawn down, will be cancelled.&hellip; <a class=\"more-link\" href=\"https:\/\/devplugin.interactionfarm.com\/?p=8636\">Continua a leggere <span class=\"screen-reader-text\">Tender Offer initiated by ENGIE: repayment of the EIB financing and possible rights issue<\/span><\/a><\/p>\n","protected":false},"author":3,"featured_media":13107,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"image","meta":[],"categories":[4,12],"tags":[37],"_links":{"self":[{"href":"https:\/\/devplugin.interactionfarm.com\/index.php?rest_route=\/wp\/v2\/posts\/8636"}],"collection":[{"href":"https:\/\/devplugin.interactionfarm.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/devplugin.interactionfarm.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/devplugin.interactionfarm.com\/index.php?rest_route=\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/devplugin.interactionfarm.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=8636"}],"version-history":[{"count":0,"href":"https:\/\/devplugin.interactionfarm.com\/index.php?rest_route=\/wp\/v2\/posts\/8636\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/devplugin.interactionfarm.com\/index.php?rest_route=\/wp\/v2\/media\/13107"}],"wp:attachment":[{"href":"https:\/\/devplugin.interactionfarm.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=8636"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/devplugin.interactionfarm.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=8636"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/devplugin.interactionfarm.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=8636"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}