{"id":7830,"date":"2017-09-13T17:15:11","date_gmt":"2017-09-13T15:15:11","guid":{"rendered":"http:\/\/www.electropowersystems.com\/?p=7830"},"modified":"2017-09-13T17:15:11","modified_gmt":"2017-09-13T15:15:11","slug":"eps-signs-epc-contract-endesa-build-20mw-largest-electric-battery-spain","status":"publish","type":"post","link":"https:\/\/devplugin.interactionfarm.com\/?p=7830","title":{"rendered":"EPS signs EPC contract with Endesa to build 20MW largest electric battery in Spain"},"content":{"rendered":"<p>Milan, 13 September 2017 \u2013 Electro Power Systems S.A. (\u201cEPS\u201d), technology pioneer in energy storage systems and microgrids, listed on the French-regulated market Euronext Paris (EPS:FP) announces the signing with Endesa of an EPC contract for the design, construction and commissioning of a 20MW utility-scale storage system.<\/p>\n<p>EPS will deliver a unique turnkey solution for serving Endesa\u2019s thermoelectric plant Carboneras located in Almeria, Spain. The storage system will be the largest in Spain and will be composed by 24 inverters, 16 containers of which 8 for PCS and 8 for Li-ion storage, with a total installed capacity of 20MW\/11.7MWh.<\/p>\n<p>The installation of this utility-scale system aims to make the plant more flexible and improve its response to the load fluctuations in the current electricity system resulting from the intermittency caused by an increased penetration of renewables. The addition of storage is also expected to reduce maintenance costs for the plant\u2019s main components and extend their useful life.<\/p>\n<p>The project is part of the general evolution of the Carboneras coal plant to better serve the current electricity system. A significant penetration of intermittent renewable energies, mainly wind power, are forcing the plant to adjust its production and implement backup functions to meet electricity demand at all times.<\/p>\n<p>\u201cThis contract confirms that EPS belongs to a selected pool of global players, able to deliver on a turnkey basis utility-scale storage systems to the world&#8217;s leading energy companies\u201d stated Giuseppe Artizzu, Executive Director &#8211; Strategy and Business Development of EPS.<\/p>\n<p>Carlalberto Guglielminotti, CEO of EPS Group also stated: \u201cIs an exceptional result for EPS and confirms the competitiveness of our cutting-edge technology\u201d.<br \/>\nThe project is expected to become operational by June 2018.<\/p>\n<p>Details will be disclosed from time to time on our website, under the section dedicated to \u201cInstallations\u201d at http:\/\/www.electropowersystems.com\/our-installations\/<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Milan, 13 September 2017 \u2013 Electro Power Systems S.A. (\u201cEPS\u201d), technology pioneer in energy storage systems and microgrids, listed on the French-regulated market Euronext Paris (EPS:FP) announces the signing with Endesa of an EPC contract for the design, construction and commissioning of a 20MW utility-scale storage system. EPS will deliver a unique turnkey solution for&hellip; <a class=\"more-link\" href=\"https:\/\/devplugin.interactionfarm.com\/?p=7830\">Continua a leggere <span class=\"screen-reader-text\">EPS signs EPC contract with Endesa to build 20MW largest electric battery in Spain<\/span><\/a><\/p>\n","protected":false},"author":3,"featured_media":7836,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"image","meta":[],"categories":[4,12],"tags":[37],"_links":{"self":[{"href":"https:\/\/devplugin.interactionfarm.com\/index.php?rest_route=\/wp\/v2\/posts\/7830"}],"collection":[{"href":"https:\/\/devplugin.interactionfarm.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/devplugin.interactionfarm.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/devplugin.interactionfarm.com\/index.php?rest_route=\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/devplugin.interactionfarm.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=7830"}],"version-history":[{"count":0,"href":"https:\/\/devplugin.interactionfarm.com\/index.php?rest_route=\/wp\/v2\/posts\/7830\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/devplugin.interactionfarm.com\/index.php?rest_route=\/wp\/v2\/media\/7836"}],"wp:attachment":[{"href":"https:\/\/devplugin.interactionfarm.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=7830"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/devplugin.interactionfarm.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=7830"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/devplugin.interactionfarm.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=7830"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}